The Left Coast Lifter Super Crane sits on the Hudson River north of the new Tappan Zee Bridge after completing the installation of the last girder on the westbound side of the new bridge
The Left Coast Lifter Super Crane sits on the Hudson River north of the new Tappan Zee Bridge after completing the installation of the last girder on the westbound side of the new bridge
Water pours from a clam shell bucket as it is pulled up from the bottom of the hudson river during dredging on the north side of the Tappan Zee Bridge on Saturday August 24, 2013
A crane lifts a clam shell bucket from the bottom of the Hudson River while dredging along the north side of the Tappan Zee Bridge on Saturday August 24, 2013
Dredging of the Hudson River continues Saturday August 24, 2013 on the north side of the Tappan Zee Bridge. A clam shell bucket operated by crane dumps mud from the bottom of the river into a waiting barge.
Mud pulled up from the bottom of the Hudson River on the north side of the Tappan Zee Bridge is dropped into a waiting barge below on Saturday August 24, 2013