NEW TAPPAN ZEE CONSTRUCTION
Read Moreerbnewtappanzee340
A blue steel girder was recently installed on the Weschester landing of the new Tapan Zee Bridge and will connect the future westbound span's on-land abutment to the first offshore support pier in the Hudson River. The girder assembly is rolled on a specially-designed track system from the east side abutment west over the railroad tracks below and toward the first pier in the river