Sloop Clearwater Major Maintenance

Read More
  • erbclearwater01

    erbclearwater01

    The sloop Clearwater continues to undergo a major maintenance overhaul project targeting the midships section of the hull, including the frames and planks beneath the waterline seen here on Saturday March 26, 2016

    erbclearwater01

  • erbclearwater02

    erbclearwater02

    The sloop Clearwater continues to undergo a major maintenance overhaul project targeting the midships section of the hull, including the frames and planks beneath the waterline seen here on Saturday March 26, 2016

    erbclearwater02

  • erbclearwater03

    erbclearwater03

    The sloop Clearwater continues to undergo a major maintenance overhaul project targeting the midships section of the hull, including the frames and planks beneath the waterline seen here on Saturday March 26, 2016

    erbclearwater03

  • erbclearwater04

    erbclearwater04

    The sloop Clearwater continues to undergo a major maintenance overhaul project targeting the midships section of the hull, including the frames and planks beneath the waterline seen here on Saturday March 26, 2016

    erbclearwater04

  • erbclearwater05

    erbclearwater05

    The sloop Clearwater sits on a barge on Rondout Creek in Kingston surrounded by shrink wrap while maintenance work on the ship continues.

    erbclearwater05

  • erbclearwater07

    erbclearwater07

    Deck hand Ryan Thomas uses both hands and alot of strength to hit a large galvanized boat nail through the bottom plank of the sloop Clearwater and into the new oak frame.

    erbclearwater07

  • erbclearwater06

    erbclearwater06

    Winter intern Catherine Horder sits under the hull of the Clearwater with the newly installed oak frame or ribs above while using a knife to widdle a sweet nail down to the peoper size

    erbclearwater06

  • erbclearwater08

    erbclearwater08

    Deck hand Ryan Thomas uses a awl and sledge hammer to recess the boating nail below the surface of the botton plank

    erbclearwater08

  • erbclearwater09

    erbclearwater09

    The sloop Clearwater continues to undergo a major maintenance overhaul project targeting the midships section of the hull, including the frames and planks beneath the waterline seen here on Saturday March 26, 2016

    erbclearwater09

  • erbclearwater10

    erbclearwater10

    Boat builder Wayne Ford (left) uses a sledge hammer to strike a large awl held by deck hand Ryan Thomas (right) while sinking a boating nail into the new oak frame of the sloop Clearwater on Saturday March 26, 2016

    erbclearwater10

  • erbclearwater11

    erbclearwater11

    A temporary wood frame was constructed above the Clearwaters top deck to hold the shrink wrap in place while work is done through the cold weather

    erbclearwater11

  • erbclearwater12

    erbclearwater12

    The arm on the deck of the sloop Clearwater used to steer the rudder

    erbclearwater12

  • erbclearwater13

    erbclearwater13

    A view from the deck of the Clearwater through the newly installed oak frame to the barge deck below

    erbclearwater13

  • erbclearwater14

    erbclearwater14

    A painting of Pete Seager hangs in the sloop Clearwater below deck

    erbclearwater14

  • erbclearwater15

    erbclearwater15

    New frame made of oak replace the old wood on the hull of the sloop Clearwater.

    erbclearwater15

  • erbClearwater16

    erbClearwater16

    A new keel made of greenwood and frame made of oak replace the old wood in the hull of the sloop Clearwater below

    erbClearwater16

  • erbclearwater18

    erbclearwater18

    Winter intern Catherine Horder climbs through the Clearwaters new frame to the deck of the barge below

    erbclearwater18

  • erbclearwater17

    erbclearwater17

    The engine room of the sloop Clearwater while undergoing major maintenance Saturday March 26, 2016

    erbclearwater17

  • erbclearwater19

    erbclearwater19

    Deck hand Ryan Thompson uses both arms while using a sledge hammer to strike a large boating nail into the new oak frame of the sloop Clearwater

    erbclearwater19

  • erbclearwater20

    erbclearwater20

    The propeller of the sloop Clearwater when the sails are down

    erbclearwater20

  • erbclearwater21

    erbclearwater21

    Laura Wendt of Brentwood volunteered to spend a day helping out the sloop Clearwater major maintenance project. Here she sands parts of the sloop to ready them for fresh paint

    erbclearwater21

  • erbclearwater22

    erbclearwater22

    The sloop Clearwater surrounded in shrink wrap on Rondout Creek in Kingston NY on Saturday March 26, 2016

    erbclearwater22

  • erbclearwater23

    erbclearwater23

    Burlap covers the Clearwaters hull near the rudder and is soaked with salt water to keep the bottom planks wet

    erbclearwater23

  • erbclearwater24

    erbclearwater24

    The mid section of the hull of Clearwater that sits below the water line is replaced

    erbclearwater24

  • erbclearwater26

    erbclearwater26

    Galvanized boating nails used to hold the planks in place

    erbclearwater26

  • erbclearwater25

    erbclearwater25

    Ruffa Espejon will shape this wood sweet nail to the proper size before it is hammered into the hull of Clearwater

    erbclearwater25

  • erbclearwater28

    erbclearwater28

    A look at the underside of Clearwaters hull and exposed frame or ribs as boat builderr Wayne Ford and deck hand Ryan Thomas (standing) replace the ships planks

    erbclearwater28

  • erbclearwater27

    erbclearwater27

    Deck hand Ryan Thomas (left) holds an awl while boat builder Wayne Ford (center) sets a boating nail into a plank with a sledge hammer. Winter intern Catherine Horder far right looks on.